五月婷婷综合网,亚洲国产精品天堂,99久久999,91精品国产色综合久久不卡蜜臀

Welcome to Suzhou Xinrongfa Metal Products Co., Ltd.
CN EN

Adhering to quality is the life of an enterprise

Coating spraying of Teflon, tungsten carbide and alumina

Service hotline:

15995489385

+ Wechat number:wechat number

Your location: Home > Information dynamics > Industry dynamics

Recommended products

National Service Hotline

15995489385

Introduce the nine operating steps of ptfe lining

Source:en      Release date: 2022年05月20日
Information summary:With the continuous improvement of high temperature resistance and corrosion resistance requirements of materials, ptfe lining has gradually entered people's field of vision.
With the continuous improvement of the requirements for high temperature resistance and corrosion resistance of materials, ptfe lining has gradually entered people's field of vision. Relying on its good physical properties, it has been affirmed by many customers, but the specific steps for this type of spraying What is it like? I think many people don't know much about it and are very interested in it. To this end, I will introduce the nine steps of ptfe lining: Step 1: Check     whether there are pores, deformations, gaps and other poor welding conditions on the
     surface of the sprayed material .      Step 2: Preparation     1. Grinding: Use an angle grinder to carefully grind the burrs, welding slag, sharp corners, and sharp corners on the surface of the material.     2. Degreasing: Use 420 ℃ high temperature degreasing for empty burning, set the holding time according to the size and weight of the workpiece, and burn off the residual oil of the material.     3. Surface roughening: sandblasting adopts 5 to 7 kg air pressure, and the surface of 20# gold steel sand is evenly sandblasted.      Step 3: Pre-treatment of ptfe spraying     1. Put the workpiece on the inner shelf of the oven.     2. Use an air gun with a pressure of not less than 5kg to blow off the dust on the sandblasted surface.     3. Before spraying, the material is preheated and dried to remove the residual water on the surface.      Step 4: Preparation before primer spraying     1. Carry out vulcanization treatment 10 minutes ahead of the spray primer.     2. Check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time to ensure smooth spraying.     3. Wear protective masks, glasses and dustproof clothing.      Step 5: Primer spraying     1. The material used is ECTFE special primer, and the specific type of primer is selected according to customer requirements.     2. The thickness of the sprayed film is about 0.16 mm, and the baking temperature is 280 °C.
     Step 6: The preparation work before
    coating is similar to primer spraying. Vulcanize the coating material 10 minutes in advance, and check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time. Ensure smooth spraying.
     Step 7: Coating operation
    1. The material used is ECTFE type.
    2. The thickness of each spraying film is between 0.15mm-0.25mm.
    3. The sintering temperature is 260°C, and the holding time will vary according to the size and weight of the sprayed material.
    4. Repeat spraying and sintering.
     Step 8: Detect the coating
    1. Use a film thickness gauge to measure the thickness of the ptfe lining to check whether it meets the corresponding standard.
    2. Check the surface for chromatic aberration, sand, sagging, etc.
    3. Laser detection is carried out on the surface of the material through the coating detection technology, and no sparks are generated as the standard.
     Step 9: Pack and transport the materials. Pack the materials
    with bubble wrap and pearl cotton to avoid bumps and damages during transportation.
     The above is a brief introduction to the ptfe lining process. If you want to know more details, welcome to our Suzhou Xinrongfa Metal Products Co., Ltd. for consultation and understanding.
主站蜘蛛池模板: 巴彦县| 出国| 平舆县| 加查县| 同德县| 荥经县| 蓬安县| 固原市| 离岛区| 临桂县| 临沧市| 河源市| 商南县| 临安市| 亚东县| 肇源县| 邓州市| 满城县| 乌兰浩特市| 安龙县| 昌吉市| 桃园市| 昔阳县| 泗阳县| 集贤县| 铁力市| 柯坪县| 丹棱县| 梅河口市| 鲁山县| 太谷县| 木里| 邹平县| 福贡县| 屏东县| 九台市| 丘北县| 监利县| 通河县| 固阳县| 汝南县|